What federal agencies actually buy
Grounds contracts usually cover the exterior of an owned or leased property on a fixed schedule. Common line items include:
- Mowing, edging, trimming and blowing on a stated frequency
- Turf treatment, aeration, seeding and fertilisation
- Shrub and tree pruning, and sometimes tree removal
- Irrigation inspection, adjustment and minor repair
- Litter and debris removal, and emptying exterior receptacles
- Snow and ice response, sometimes as a separate seasonal line item
- Seasonal colour rotations and bed maintenance
The statement of work normally defines measurable standards, such as maximum turf height, inspection frequency and the response time for a complaint.
The NAICS codes that matter
NAICS 561730, Landscaping Services, is the usual classification for grounds maintenance. Building-support work can appear under 561790. As with every code, the size standard is set separately by the Small Business Administration, so confirm the one attached to the code in the notice.
What makes these contracts different
- Weather dependency. Schedules assume normal conditions; the contract usually states how lost days are handled and whether make-up service is required.
- Seasonality and pricing. A single annual price has to cover a peak growing season and a quiet winter, or the notice may price seasons separately.
- Licensing. Pesticide and herbicide application generally requires state licensing and certified applicators.
- Equipment expectations. Some notices require specific equipment, on-site storage or a stated response time that only a local crew can meet.
- Wage determinations. Grounds maintenance can be covered by Service Contract Act wage determinations, which set minimum pay for the classifications used.
How to find relevant opportunities
Search official notices by NAICS 561730 and by terms such as grounds maintenance, landscaping, mowing, snow removal and turf. Filter by the states you can serve, and read the place of performance: a single notice can cover several sites across a region.
Watch for presolicitation and sources-sought notices. They often reveal the agency's intended schedule and site list months before the solicitation is issued, which gives you time to visit and price properly.
Where first-time bidders usually get stuck
- Pricing a full year from a summer visit. Winter response obligations can be the most expensive part of the contract.
- Missing insurance and bonding requirements. Some notices require specific liability limits or performance security.
- No plan for equipment failure. A quality control plan that assumes perfect equipment is a common weakness.
- Overlooking submission formalities. A required site visit, a specific form or a late upload can end a bid before it is read.
How BidScout helps you evaluate one
For a given notice, BidScout summarises what the agency is buying, screens the stated requirements against your business profile, builds a submission checklist and highlights risk areas such as missing documents or unverified requirements. The score describes fit with your profile, not your chance of winning.